Projects Completed

S. No. Name of Work Date of Acceptance Date of Completion Original Agreement Cost Final Agreement Cost Total Payment Received
1 Supply of P.way material, laying and linking of Railway track including Earthwork, civil work for Extension of Railway Bridges and RCC Boxes for Situ RUB etc. in connection with development of MMLP at Barhi near Rajlu Garhi Railway Station, Sonipat (Haryana). 23.05.2016 30.10.2020 229,791,972.58 338,283,705.00 338,283,705.00
2 Construction of Railway Connectivity from Borekhedi Station to our project site at Nagpur. 07.01.2020 31.03.2022 31,55,83,626.00 (Including 12% GST) 28,67,60,551.00 (Excluding 12% GST) 304,991,255.07
3 Construction of road under bridge (RUB 11 nos.) in lieu of level Xing no.22 at km. 1142/0-1, L.xing no.34 at km. 1171/11-13, L.xing no.44 at Km.1195/9-11, L.xing no.45 at km. 1198/9-11, L.xing no.47 at Km.1201/15-17, L.xing no.49 at km. 1205/11-13, L.xing no.50 at Km.1207/9-11, L.xing no.53 at km. 1214/5-7, L.xing no.54 at Km.1215/19-21, L.xing no.55 at km.1219/1-3, & L.xing no.57 at km. 1222/7-9, with RCC Box with RH girder method, RCC approaches, RCC roof slab over approaches, CC road, height gauge and other allied works bet. Bharthana-Firojabad station on CNB-ETW-TDL section of ALD Divn. of N. C. Railway. 10.08.2015 25.05.2022 369,430,313.85 519,254,632.58 249,398,007.41
4 Construction of Railway siding including Earthwork in Formation, supply of ballast & P.Way material, linking of Track and Construction of RUB/Culvert/Drain/Road inside NTPC Plant, Dadri. 03.09.2009 31.08.2012 244,193,964.82 240,070,873.22
5 Linking of BG Track & turnouts, Provisions of Glued joints & SEJ, dismantling of existing track & turnouts, handling, lifting, loading, unloading and spreading of ballast and P.way material, working in BNI/NI period and other misc. works from km 43.00 to Km 80.300 between Roza (including) and Maigalganj (including) stations and leading, loading, unloading and stacking of P.way material from any place/state to Rosa-Sitapur section in connection with doubling between Rosa-Sitapur in Moradabad Division. 16.07.2019 31.05.2023 154,860,542.19 206,524,338.58 218,360,176.10
6 Contract-CT-04: Supply, Installation, Testing and Commissioning of Standard Gauge Track work along with Ballasted/Ballastless Tracks in Charkop Metro Depot in Line 2A Dahisar (East) to D.N. Nagar Corridor, of Mumbai Metro Rail Project of MMRDA. 29.08.2018 31.03.2021 149,998,682.00 156,752,444.58 130,858,312.77
7 Civil and Permanent ways work for Rail connectivity to proposed ICD of Adani Logistics multimodal logistics from Kila-Raipur Station. 02.05.2016 31.05.2017 154,881,323.00 152,015,123.00 104,935,315.00
8 Construction of circulating area, road, boundary wall, relay huts, earthwork in embankment & cutting, drains etc. & other allied works from Palwal to Jn cabin in connection with construction of 4th line between PWL-TKD JN Cabin. 31.03.2014 30.11.2016 68,663,411.40 70,383,729.85 58,013,595.17
9 Remodeling of Hathras Yard for extension of line and platform i.e. linking of tracks and turnouts, deep screening, spreading of ballast etc. including dismantling of existing track, turnouts and slewing of track, earthwork, leading of materials, construction of platforms etc. and other connected works on TDL-GZB section of Allahabad division. 28.08.2009 31.12.2013 30,447,630.12 29,498,161.00
10 Construction of stator line including Earthwork in Formation, supply of ballast & P.Way material, linking of Track and Construction of RUB/Culvert inside NTPC Plant, Dadri. 11.12.2008 01.04.2009 23,029,470.00 22,573,372.00
11 Execution of P.Way work of Railway siding of ACTIL Ballabgarh, Haryana. 13.03.2008 30.09.2008 14,504,514.24 16,490,376.00
12 Construction of Private railway siding for 2.5 MPTA Cement Plant of Wonder Cement Ltd. at R. K. Nagar, Nimbahera, Chittorgarh, Rajasthan. 01.03.2012 30.09.2013 169,800,000.00 150,066,624.00 11,067,863.00
13 Construction of Additional Railway spur & associated facilities within refinery area for Guru Gobind Singh Refinery in respect of installation of 2 X 300 TPH Coal / Petcoke fired steam generators & associated systems at Guru Gobind Singh Refinery, Bathinda. 27.03.2015 30.06.2016 59,246,212.00 12,377,463.00
14 Deep Screening of track and turnouts and other ancillary work in the section of sr.DEN-II/DLI. 23.07.2014 10.06.2018 12,698,548.00 11,375,547.91
15 Construction of Private railway siding for 2.5 MPTA Cement Plant of Wonder Cement Ltd. at R. K. Nagar, Nimbahera, Chittorgarh, Rajasthan. 01.03.2012 30.09.2013 169,800,000.00 150,066,624.00 11,067,863.00
16 Complete track renewal of 11.41Kms 1.41Kms TRR (P) and shifting of 2 turnouts of Delhi-Ambala Section under ADEN/Panipat. 14.02.2007 19.09.2008 9,012,850.00 10,132,366.00 10,132,366.00
17 TSR (P) 4.00 Km of UP & DN main line, GAL and other passenger lines of New Delhi Yard. 13.08.2008 20.03.2011 8,756,898.00 9,835,897.00 9,835,897.00
18 Loading, leading, unloading and stacking of Railway materials for P.way from Delhi, UP, Haryana, Punjab, Himachal Pradesh, Uttranchal, J&K and Rajasthan for all work including leading loading, unloading and stacking of Rails, Fan shaped PRC sleeper, SEJ, Glued Joints, fitting, L-Xing sleeper, Guard rail sleeper, fastenning of track, point & Crossing etc. from any place to various sites between Jalandhar City-Pathankot section in connection with Jalandhar City Pathankot Doubling. 06.12.2006 30.07.2008 9,721,620.70 7,272,530.82 7,272,530.82
19 Linking of track from Tanda Urmur (including) Km.42/600 to Khudda Kurala (including) Km.50/369.82 including Tanda Urmur and Khuda Kurala yards in connection with Jalandhar-Pathankot-Jammu Tawi Doubling. 15.09.2007 27.08.2009 6,875,063.49 6,875,063.49 6,875,063.49
20 Loading leading & unloading stacking of Railway materials from Delhi, UP, Haryana, Punjab and Rajasthan for all work including leading loading & unloading stacking of rails PRC sleeper, Fan shaped PRC sleepers, SEJ, Glued Joints, fitting & fastenning of track, point & Crossing etc. from any place to various sites between Jalandhar City-Pathankot section in connection with Jalandhar City Pathankot Doubling. 15.01.2003 30.04.2006 7,483,634.30 7,109,771.85 6,817,027.96
21 CTR (s) 3.45 Km (Pt. of 5-CTRs/03-04 and 2.91 Kms (Pt. of 16 CTR (P) total 6.30 Kms of various yard lines in the section of SE/P.Way/SSB under ADEN/DLI. 13.01.2009 31.07.2011 6,592,646.00 5,925,219.64 5,925,219.61
22 Assembling & Laying of 50 Nos. fan shaped turnouts in the Section of ADEN/Rohtak. 04.12.2006 30.09.2007 3,890,660.00 3,839,741.00 3,839,741.00
23 Providing, fixing & Commissioning of Lifting Barriers including Construction work, painting etc. on Engineering Gates No.C-68/2, C-76, C-77/2, C-80/2, C-86, C-87/1, C-87-a, C-88/2, C-97/2, C-99/2, C-103/2, C-105/2 and C-106/2 etc. between Tanda Urmar (excluding) to Mukerian (excluding) on JRC-PTK section on Firozepur Division in connection with Doubling between Jalandhar Cantt-Jammu Tawi section. 29.12.2006 21.02.2008 3,156,444.60 2,170,055.66 2,170,055.66
24 Contract-CT-28: Supply, Installation, Testing and Commissioning of Standard Gauge Track Work, along with Ballasted/Ballastless Tracks in Greater Noida Depot of Noida Metro Project. 06.07.2016 30.09.2018 189,359,018.62 187,915,729.52 18,79,15,729.52 + Price Variation 63,23,324.68
25 P.Way linking and other allied works such as Assembling, laying, linking & Dismantling of BG Railway Track, Points & Crossings, traps, leading of P.Way materials & PRC sleepers, putting of 65mm machine crushed stone ballast etc. from Gohana (excluding) to Sonepat (including) Chainage 50/500 to 89/600 in connection with construction of New Line between Jind-Sonepat. 20.12.2013 25.09.2016 56,998,519.07 57,878,472.62 57,878,473.74 + PVC 25,32,181.65
26 Construction of platforms, Covered shed and other Civil work etc. in connection with Aligarh Jn. Improvement station with provision of the Dn loop & one platform balance work of RVNL. 12.09.2013 24.01.2018 63,681,555.00 79,706,277.00 7,97,06,277 + PVC 25,91,087
S. No. Name of Work Date of Completion
1 OCP-731: Supply of Ballast in Shastri Park Depot of Line-1, Khyber Pass, Sultanpur Depot of Line-2, Mukundpur & Vinod Nagar Depot of Line-7, Leading, Spreading, Dressing/Boxing of ballast as per LWR Profile 31.07.2024
2 Balance work of terminated work of Earthwork (Cutting/Filling), Construction of CC Block Pavement, Approach Road, Culvert, P-Way Track Work, Boundary Wall, Pre-Engineered Warehouses, Admin. Bldg., Canteen, and other Allied works i/c development of MMLP at KADAKOLA (Mysuru) 30.06.2024
3 Linking of BG Track & turnouts, Provisions of Glued joints & SEJ, dismantling of existing track & turnouts, handling, lifting, loading, unloading and spreading of ballast and P.way material, working in BNI/NI period and other misc. works from km 43.00 to Km 80.300 between Roza (including) and Maigalganj (including) stations and leading, loading, unloading and stacking of P.way material from any place/state to Rosa-Sitapur section in connection with doubling between Rosa-Sitapur in Moradabad Division. 31.05.2023
4 Construction of road under bridge (RUB 11 nos.) in lieu of level Xing no.22 at km. 1142/0-1, L.xing no.34 at km. 1171/11-13, L.xing no.44 at Km.1195/9-11, L.xing no.45 at km. 1198/9-11, L.xing no.47 at Km.1201/15-17, L.xing no.49 at km. 1205/11-13, L.xing no.50 at Km.1207/9-11, L.xing no.53 at km. 1214/5-7, L.xing no.54 at Km.1215/19-21, L.xing no.55 at km.1219/1-3, & L.xing no.57 at km. 1222/7-9, with RCC Box with RH girder method, RCC approaches, RCC roof slab over approaches, CC road, height gauge and other allied works bet. Bharthana-Firojabad station on CNB-ETW-TDL section of ALD Divn. of N. C. Railway. 25.05.2022
5 Construction of Railway Connectivity from Borekhedi Station to our project site at Nagpur. 31.03.2022
6 Contract-CT-04: Supply, Installation, Testing and Commissioning of Standard Gauge Track work along with Ballasted/Ballastless Tracks in Charkop Metro Depot in Line 2A Dahisar (East) to D.N. Nagar Corridor, of Mumbai Metro Rail Project of MMRDA. 31.03.2021
7 Supply of P.way material, laying and linking of Railway track including Earthwork, civil work for Extension of Railway Bridges and RCC Boxes for Situ RUB etc. in connection with development of MMLP at Barhi near Rajlu Garhi Railway Station, Sonipat (Haryana). 30.10.2020
8 Contract-CT-28: Supply, Installation, Testing and Commissioning of Standard Gauge Track Work, along with Ballasted/Ballastless Tracks in Greater Noida Depot of Noida Metro Project. 30.09.2018
9 Deep Screening of track and turnouts and other ancillary work in the section of sr.DEN-II/DLI. 10.06.2018
10 Construction of platforms, Covered shed and other Civil work etc. in connection with Aligarh Jn. Improvement station with provision of the Dn loop & one platform balance work of RVNL. 24.01.2018
11 Civil and Permanent ways work for Rail connectivity to proposed ICD of Adani Logistics multimodal logistics from Kila-Raipur Station. 31.05.2017
12 Construction of circulating area, road, boundary wall, relay huts, earthwork in embankment & cutting, drains etc. & other allied works from Palwal to Jn cabin in connection with construction of 4th line between PWL-TKD JN Cabin. 30.11.2016
13 P.Way linking and other allied works such as Assembling, laying, linking & Dismantling of BG Railway Track, Points & Crossings, traps, leading of P.Way materials & PRC sleepers, putting of 65mm machine crushed stone ballast etc. from Gohana (excluding) to Sonepat (including) Chainage 50/500 to 89/600 in connection with construction of New Line between Jind-Sonepat. 25.09.2016
14 Construction of Additional Railway spur & associated facilities within refinery area for Guru Gobind Singh Refinery in respect of installation of 2 X 300 TPH Coal / Petcoke fired steam generators & associated systems at Guru Gobind Singh Refinery, Bathinda. 30.06.2016
15 Remodeling of Hathras Yard for extension of line and platform i.e. linking of tracks and turnouts, deep screening, spreading of ballast etc. including dismantling of existing track, turnouts and slewing of track, earthwork, leading of materials, construction of platforms etc. and other connected works on TDL-GZB section of Allahabad division. 31.12.2013
16 Construction of Private railway siding for 2.5 MPTA Cement Plant of Wonder Cement Ltd. at R. K. Nagar, Nimbahera, Chittorgarh, Rajasthan. 30.09.2013
17 Construction of Railway siding including Earthwork in Formation, supply of ballast & P.Way material, linking of Track and Construction of RUB/Culvert/Drain/Road inside NTPC Plant, Dadri. 31.08.2012
18 CTR (s) 3.45 Km (Pt. of 5-CTRs/03-04 and 2.91 Kms (Pt. of 16 CTR (P) total 6.30 Kms of various yard lines in the section of SE/P.Way/SSB under ADEN/DLI. 31.07.2011
19 TSR (P) 4.00 Km of UP & DN main line, GAL and other passenger lines of New Delhi Yard. 20.03.2011
20 Linking of track from Tanda Urmur (including) Km.42/600 to Khudda Kurala (including) Km.50/369.82 including Tanda Urmur and Khuda Kurala yards in connection with Jalandhar-Pathankot-Jammu Tawi Doubling. 27.08.2009
21 Construction of stator line including Earthwork in Formation, supply of ballast & P.Way material, linking of Track and Construction of RUB/Culvert inside NTPC Plant, Dadri. 01.04.2009
22 Execution of P.Way work of Railway siding of ACTIL Ballabgarh, Haryana. 30.09.2008
23 Complete track renewal of 11.41Kms 1.41Kms TRR (P) and shifting of 2 turnouts of Delhi-Ambala Section under ADEN/Panipat. 19.09.2008
24 Loading, leading, unloading and stacking of Railway materials for P.way from Delhi, UP, Haryana, Punjab, Himachal Pradesh, Uttranchal, J&K and Rajasthan for all work including leading loading, unloading and stacking of Rails, Fan shaped PRC sleeper, SEJ, Glued Joints, fitting, L-Xing sleeper, Guard rail sleeper, fastenning of track, point & Crossing etc. from any place to various sites between Jalandhar City-Pathankot section in connection with Jalandhar City Pathankot Doubling. 30.07.2008
25 Providing, fixing & Commissioning of Lifting Barriers including Construction work, painting etc. on Engineering Gates No.C-68/2, C-76, C-77/2, C-80/2, C-86, C-87/1, C-87-a, C-88/2, C-97/2, C-99/2, C-103/2, C-105/2 and C-106/2 etc. between Tanda Urmar (excluding) to Mukerian (excluding) on JRC-PTK section on Firozepur Division in connection with Doubling between Jalandhar Cantt-Jammu Tawi section. 21.02.2008
26 Assembling & Laying of 50 Nos. fan shaped turnouts in the Section of ADEN/Rohtak. 30.09.2007
27 Loading leading & unloading stacking of Railway materials from Delhi, UP, Haryana, Punjab and Rajasthan for all work including leading loading & unloading stacking of rails PRC sleeper, Fan shaped PRC sleepers, SEJ, Glued Joints, fitting & fastenning of track, point & Crossing etc. from any place to various sites between Jalandhar City-Pathankot section in connection with Jalandhar City Pathankot Doubling. 30.04.2006
S. No. Name of Work Date of Completion
1 Supply of P.way material, laying and linking of Railway track including Earthwork, civil work for Extension of Railway Bridges and RCC Boxes for Situ RUB etc. in connection with development of MMLP at Barhi near Rajlu Garhi Railway Station, Sonipat (Haryana). 30.10.2020
2 Construction of Railway Connectivity from Borekhedi Station to our project site at Nagpur. 31.03.2022
3 Construction of road under bridge (RUB 11 nos.) in lieu of level Xing no.22 at km. 1142/0-1, L.xing no.34 at km. 1171/11-13, L.xing no.44 at Km.1195/9-11, L.xing no.45 at km. 1198/9-11, L.xing no.47 at Km.1201/15-17, L.xing no.49 at km. 1205/11-13, L.xing no.50 at Km.1207/9-11, L.xing no.53 at km. 1214/5-7, L.xing no.54 at Km.1215/19-21, L.xing no.55 at km.1219/1-3, & L.xing no.57 at km. 1222/7-9, with RCC Box with RH girder method, RCC approaches, RCC roof slab over approaches, CC road, height gauge and other allied works bet. Bharthana-Firojabad station on CNB-ETW-TDL section of ALD Divn. of N. C. Railway. 25.05.2022
4 Construction of Railway siding including Earthwork in Formation, supply of ballast & P.Way material, linking of Track and Construction of RUB/Culvert/Drain/Road inside NTPC Plant, Dadri. 31.08.2012
5 Linking of BG Track & turnouts, Provisions of Glued joints & SEJ, dismantling of existing track & turnouts, handling, lifting, loading, unloading and spreading of ballast and P.way material, working in BNI/NI period and other misc. works from km 43.00 to Km 80.300 between Roza (including) and Maigalganj (including) stations and leading, loading, unloading and stacking of P.way material from any place/state to Rosa-Sitapur section in connection with doubling between Rosa-Sitapur in Moradabad Division. 31.05.2023
6 Contract-CT-04: Supply, Installation, Testing and Commissioning of Standard Gauge Track work along with Ballasted/Ballastless Tracks in Charkop Metro Depot in Line 2A Dahisar (East) to D.N. Nagar Corridor, of Mumbai Metro Rail Project of MMRDA. 31.03.2021
7 Civil and Permanent ways work for Rail connectivity to proposed ICD of Adani Logistics multimodal logistics from Kila-Raipur Station. 31.05.2017
8 Construction of circulating area, road, boundary wall, relay huts, earthwork in embankment & cutting, drains etc. & other allied works from Palwal to Jn cabin in connection with construction of 4th line between PWL-TKD JN Cabin. 30.11.2016
9 Remodeling of Hathras Yard for extension of line and platform i.e. linking of tracks and turnouts, deep screening, spreading of ballast etc. including dismantling of existing track, turnouts and slewing of track, earthwork, leading of materials, construction of platforms etc. and other connected works on TDL-GZB section of Allahabad division. 31.12.2013
10 Construction of stator line including Earthwork in Formation, supply of ballast & P.Way material, linking of Track and Construction of RUB/Culvert inside NTPC Plant, Dadri. 01.04.2009
11 Execution of P.Way work of Railway siding of ACTIL Ballabgarh, Haryana. 30.09.2008
12 Construction of Private railway siding for 2.5 MPTA Cement Plant of Wonder Cement Ltd. at R. K. Nagar, Nimbahera, Chittorgarh, Rajasthan. 30.09.2013
13 Construction of Additional Railway spur & associated facilities within refinery area for Guru Gobind Singh Refinery in respect of installation of 2 X 300 TPH Coal / Petcoke fired steam generators & associated systems at Guru Gobind Singh Refinery, Bathinda. 30.06.2016
14 Deep Screening of track and turnouts and other ancillary work in the section of sr.DEN-II/DLI. 10.06.2018
15 Construction of Private railway siding for 2.5 MPTA Cement Plant of Wonder Cement Ltd. at R. K. Nagar, Nimbahera, Chittorgarh, Rajasthan. 30.09.2013
16 Complete track renewal of 11.41Kms 1.41Kms TRR (P) and shifting of 2 turnouts of Delhi-Ambala Section under ADEN/Panipat. 19.09.2008
17 TSR (P) 4.00 Km of UP & DN main line, GAL and other passenger lines of New Delhi Yard. 20.03.2011
18 Loading, leading, unloading and stacking of Railway materials for P.way from Delhi, UP, Haryana, Punjab, Himachal Pradesh, Uttranchal, J&K and Rajasthan for all work including leading loading, unloading and stacking of Rails, Fan shaped PRC sleeper, SEJ, Glued Joints, fitting, L-Xing sleeper, Guard rail sleeper, fastenning of track, point & Crossing etc. from any place to various sites between Jalandhar City-Pathankot section in connection with Jalandhar City Pathankot Doubling. 30.07.2008
19 Linking of track from Tanda Urmur (including) Km.42/600 to Khudda Kurala (including) Km.50/369.82 including Tanda Urmur and Khuda Kurala yards in connection with Jalandhar-Pathankot-Jammu Tawi Doubling. 27.08.2009
20 Loading leading & unloading stacking of Railway materials from Delhi, UP, Haryana, Punjab and Rajasthan for all work including leading loading & unloading stacking of rails PRC sleeper, Fan shaped PRC sleepers, SEJ, Glued Joints, fitting & fastenning of track, point & Crossing etc. from any place to various sites between Jalandhar City-Pathankot section in connection with Jalandhar City Pathankot Doubling. 30.04.2006
21 CTR (s) 3.45 Km (Pt. of 5-CTRs/03-04 and 2.91 Kms (Pt. of 16 CTR (P) total 6.30 Kms of various yard lines in the section of SE/P.Way/SSB under ADEN/DLI. 31.07.2011
22 Assembling & Laying of 50 Nos. fan shaped turnouts in the Section of ADEN/Rohtak. 30.09.2007
23 Providing, fixing & Commissioning of Lifting Barriers including Construction work, painting etc. on Engineering Gates No.C-68/2, C-76, C-77/2, C-80/2, C-86, C-87/1, C-87-a, C-88/2, C-97/2, C-99/2, C-103/2, C-105/2 and C-106/2 etc. between Tanda Urmar (excluding) to Mukerian (excluding) on JRC-PTK section on Firozepur Division in connection with Doubling between Jalandhar Cantt-Jammu Tawi section. 21.02.2008
24 Contract-CT-28: Supply, Installation, Testing and Commissioning of Standard Gauge Track Work, along with Ballasted/Ballastless Tracks in Greater Noida Depot of Noida Metro Project. 30.09.2018
25 P.Way linking and other allied works such as Assembling, laying, linking & Dismantling of BG Railway Track, Points & Crossings, traps, leading of P.Way materials & PRC sleepers, putting of 65mm machine crushed stone ballast etc. from Gohana (excluding) to Sonepat (including) Chainage 50/500 to 89/600 in connection with construction of New Line between Jind-Sonepat. 25.09.2016
26 Construction of platforms, Covered shed and other Civil work etc. in connection with Aligarh Jn. Improvement station with provision of the Dn loop & one platform balance work of RVNL. 24.01.2018