1 |
Supply of P.way material, laying and linking of Railway track including Earthwork, civil work for Extension of Railway Bridges and RCC Boxes for Situ RUB etc. in connection with development of MMLP at Barhi near Rajlu Garhi Railway Station, Sonipat (Haryana). |
23.05.2016 |
30.10.2020 |
229,791,972.58 |
338,283,705.00 |
338,283,705.00 |
2 |
Construction of Railway Connectivity from Borekhedi Station to our project site at Nagpur. |
07.01.2020 |
31.03.2022 |
31,55,83,626.00 (Including 12% GST) |
28,67,60,551.00 (Excluding 12% GST) |
304,991,255.07 |
3 |
Construction of road under bridge (RUB 11 nos.) in lieu of level Xing no.22 at km. 1142/0-1, L.xing no.34 at km. 1171/11-13, L.xing no.44 at Km.1195/9-11, L.xing no.45 at km. 1198/9-11, L.xing no.47 at Km.1201/15-17, L.xing no.49 at km. 1205/11-13, L.xing no.50 at Km.1207/9-11, L.xing no.53 at km. 1214/5-7, L.xing no.54 at Km.1215/19-21, L.xing no.55 at km.1219/1-3, & L.xing no.57 at km. 1222/7-9, with RCC Box with RH girder method, RCC approaches, RCC roof slab over approaches, CC road, height gauge and other allied works bet. Bharthana-Firojabad station on CNB-ETW-TDL section of ALD Divn. of N. C. Railway. |
10.08.2015 |
25.05.2022 |
369,430,313.85 |
519,254,632.58 |
249,398,007.41 |
4 |
Construction of Railway siding including Earthwork in Formation, supply of ballast & P.Way material, linking of Track and Construction of RUB/Culvert/Drain/Road inside NTPC Plant, Dadri. |
03.09.2009 |
31.08.2012 |
244,193,964.82 |
– |
240,070,873.22 |
5 |
Linking of BG Track & turnouts, Provisions of Glued joints & SEJ, dismantling of existing track & turnouts, handling, lifting, loading, unloading and spreading of ballast and P.way material, working in BNI/NI period and other misc. works from km 43.00 to Km 80.300 between Roza (including) and Maigalganj (including) stations and leading, loading, unloading and stacking of P.way material from any place/state to Rosa-Sitapur section in connection with doubling between Rosa-Sitapur in Moradabad Division. |
16.07.2019 |
31.05.2023 |
154,860,542.19 |
206,524,338.58 |
218,360,176.10 |
6 |
Contract-CT-04: Supply, Installation, Testing and Commissioning of Standard Gauge Track work along with Ballasted/Ballastless Tracks in Charkop Metro Depot in Line 2A Dahisar (East) to D.N. Nagar Corridor, of Mumbai Metro Rail Project of MMRDA. |
29.08.2018 |
31.03.2021 |
149,998,682.00 |
156,752,444.58 |
130,858,312.77 |
7 |
Civil and Permanent ways work for Rail connectivity to proposed ICD of Adani Logistics multimodal logistics from Kila-Raipur Station. |
02.05.2016 |
31.05.2017 |
154,881,323.00 |
152,015,123.00 |
104,935,315.00 |
8 |
Construction of circulating area, road, boundary wall, relay huts, earthwork in embankment & cutting, drains etc. & other allied works from Palwal to Jn cabin in connection with construction of 4th line between PWL-TKD JN Cabin. |
31.03.2014 |
30.11.2016 |
68,663,411.40 |
70,383,729.85 |
58,013,595.17 |
9 |
Remodeling of Hathras Yard for extension of line and platform i.e. linking of tracks and turnouts, deep screening, spreading of ballast etc. including dismantling of existing track, turnouts and slewing of track, earthwork, leading of materials, construction of platforms etc. and other connected works on TDL-GZB section of Allahabad division. |
28.08.2009 |
31.12.2013 |
30,447,630.12 |
– |
29,498,161.00 |
10 |
Construction of stator line including Earthwork in Formation, supply of ballast & P.Way material, linking of Track and Construction of RUB/Culvert inside NTPC Plant, Dadri. |
11.12.2008 |
01.04.2009 |
23,029,470.00 |
– |
22,573,372.00 |
11 |
Execution of P.Way work of Railway siding of ACTIL Ballabgarh, Haryana. |
13.03.2008 |
30.09.2008 |
14,504,514.24 |
– |
16,490,376.00 |
12 |
Construction of Private railway siding for 2.5 MPTA Cement Plant of Wonder Cement Ltd. at R. K. Nagar, Nimbahera, Chittorgarh, Rajasthan. |
01.03.2012 |
30.09.2013 |
169,800,000.00 |
150,066,624.00 |
11,067,863.00 |
13 |
Construction of Additional Railway spur & associated facilities within refinery area for Guru Gobind Singh Refinery in respect of installation of 2 X 300 TPH Coal / Petcoke fired steam generators & associated systems at Guru Gobind Singh Refinery, Bathinda. |
27.03.2015 |
30.06.2016 |
59,246,212.00 |
– |
12,377,463.00 |
14 |
Deep Screening of track and turnouts and other ancillary work in the section of sr.DEN-II/DLI. |
23.07.2014 |
10.06.2018 |
12,698,548.00 |
– |
11,375,547.91 |
15 |
Construction of Private railway siding for 2.5 MPTA Cement Plant of Wonder Cement Ltd. at R. K. Nagar, Nimbahera, Chittorgarh, Rajasthan. |
01.03.2012 |
30.09.2013 |
169,800,000.00 |
150,066,624.00 |
11,067,863.00 |
16 |
Complete track renewal of 11.41Kms 1.41Kms TRR (P) and shifting of 2 turnouts of Delhi-Ambala Section under ADEN/Panipat. |
14.02.2007 |
19.09.2008 |
9,012,850.00 |
10,132,366.00 |
10,132,366.00 |
17 |
TSR (P) 4.00 Km of UP & DN main line, GAL and other passenger lines of New Delhi Yard. |
13.08.2008 |
20.03.2011 |
8,756,898.00 |
9,835,897.00 |
9,835,897.00 |
18 |
Loading, leading, unloading and stacking of Railway materials for P.way from Delhi, UP, Haryana, Punjab, Himachal Pradesh, Uttranchal, J&K and Rajasthan for all work including leading loading, unloading and stacking of Rails, Fan shaped PRC sleeper, SEJ, Glued Joints, fitting, L-Xing sleeper, Guard rail sleeper, fastenning of track, point & Crossing etc. from any place to various sites between Jalandhar City-Pathankot section in connection with Jalandhar City Pathankot Doubling. |
06.12.2006 |
30.07.2008 |
9,721,620.70 |
7,272,530.82 |
7,272,530.82 |
19 |
Linking of track from Tanda Urmur (including) Km.42/600 to Khudda Kurala (including) Km.50/369.82 including Tanda Urmur and Khuda Kurala yards in connection with Jalandhar-Pathankot-Jammu Tawi Doubling. |
15.09.2007 |
27.08.2009 |
6,875,063.49 |
6,875,063.49 |
6,875,063.49 |
20 |
Loading leading & unloading stacking of Railway materials from Delhi, UP, Haryana, Punjab and Rajasthan for all work including leading loading & unloading stacking of rails PRC sleeper, Fan shaped PRC sleepers, SEJ, Glued Joints, fitting & fastenning of track, point & Crossing etc. from any place to various sites between Jalandhar City-Pathankot section in connection with Jalandhar City Pathankot Doubling. |
15.01.2003 |
30.04.2006 |
7,483,634.30 |
7,109,771.85 |
6,817,027.96 |
21 |
CTR (s) 3.45 Km (Pt. of 5-CTRs/03-04 and 2.91 Kms (Pt. of 16 CTR (P) total 6.30 Kms of various yard lines in the section of SE/P.Way/SSB under ADEN/DLI. |
13.01.2009 |
31.07.2011 |
6,592,646.00 |
5,925,219.64 |
5,925,219.61 |
22 |
Assembling & Laying of 50 Nos. fan shaped turnouts in the Section of ADEN/Rohtak. |
04.12.2006 |
30.09.2007 |
3,890,660.00 |
3,839,741.00 |
3,839,741.00 |
23 |
Providing, fixing & Commissioning of Lifting Barriers including Construction work, painting etc. on Engineering Gates No.C-68/2, C-76, C-77/2, C-80/2, C-86, C-87/1, C-87-a, C-88/2, C-97/2, C-99/2, C-103/2, C-105/2 and C-106/2 etc. between Tanda Urmar (excluding) to Mukerian (excluding) on JRC-PTK section on Firozepur Division in connection with Doubling between Jalandhar Cantt-Jammu Tawi section. |
29.12.2006 |
21.02.2008 |
3,156,444.60 |
2,170,055.66 |
2,170,055.66 |
24 |
Contract-CT-28: Supply, Installation, Testing and Commissioning of Standard Gauge Track Work, along with Ballasted/Ballastless Tracks in Greater Noida Depot of Noida Metro Project. |
06.07.2016 |
30.09.2018 |
189,359,018.62 |
187,915,729.52 |
18,79,15,729.52 + Price Variation 63,23,324.68 |
25 |
P.Way linking and other allied works such as Assembling, laying, linking & Dismantling of BG Railway Track, Points & Crossings, traps, leading of P.Way materials & PRC sleepers, putting of 65mm machine crushed stone ballast etc. from Gohana (excluding) to Sonepat (including) Chainage 50/500 to 89/600 in connection with construction of New Line between Jind-Sonepat. |
20.12.2013 |
25.09.2016 |
56,998,519.07 |
57,878,472.62 |
57,878,473.74 + PVC 25,32,181.65 |
26 |
Construction of platforms, Covered shed and other Civil work etc. in connection with Aligarh Jn. Improvement station with provision of the Dn loop & one platform balance work of RVNL. |
12.09.2013 |
24.01.2018 |
63,681,555.00 |
79,706,277.00 |
7,97,06,277 + PVC 25,91,087 |